PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at Bathrooms 133-136 Facing West.jpg Installed copper piping at the 4th floor bathroom Facing West.jpg Installed sheathing around the perimeter of the UCIA Roof Facing East.jpg
Previous pageNext page Installed copper piping at the 4th floor bathroom Facing West
Installed copper piping at the 4th floor bathroom Facing West